Project Description

CR202 over Black Creek (School Road) Superstructure Replacement

Guilderland Center, Albany County, New York

Creighton Manning provided survey, preliminary and final design, and construction inspection services for this County-funded bridge superstructure replacement project. The project involved complete removal of the existing 33 ft. long, single-span, precast concrete superstructure and reconstruction of the roadway approaches. The new  superstructure consists of galvanized steel beams with a cast-in-place concrete deck. A second sidewalk with ADA compliant ramps was added on the west side of the bridge extending to NYS 146 to the north as recommended in the Guilderland Center Neighborhood Master Plan. The project site was closed during construction and traffic maintained utilizing a temporary off-site detour. Construction was completed during the summer to avoid significant impacts to the nearby Guilderland High School.