Project Description

Roaring Brook Wind Power Project Site Design

Town of Martinsburg, Lewis County, New York

This project involved the construction of wind farm consisting of 39 Gamesa turbines on 100m towers with an output capacity of approximately 78 MW. The project was part of a continuing effort to supply more renewable energy to consumers while minimizing environmental impacts to every extent practicable. The project consisted of an O & M facility, collection system, collection and interconnection substations and layout areas for project components and materials. Off-site improvements identified by the Transportation Route Evaluation Study consisted of intersection and corridor improvements, utility relocations and drainage improvements. Creighton Manning was responsible for site plan design and the Stormwater Pollution Prevention Plan (SWPPP). The firm also prepared the Transportation Route Evaluation Study submitted as part of the Supplemental Environmental Impact Statement.